Getting Started

From New Account to First Field Report: A Full Walkthrough

Last updated

This walkthrough sets up a Sitefotos account from scratch and follows it all the way to the first report arriving from the field. We use a fictional company, Ridge Works, and build the same thing you will: a few sites, a couple of services and materials, one employee and one contractor, and a single form the crew fills out on site. By the end, a real submission from the mobile app lands on the Service History page.

1. Sign In to the Backoffice

Sign in at www.sitefotos.com with the email address and password you created when you signed up. The backoffice is where everything in this walkthrough happens until the final step.

The Sitefotos website sign-in form with an email address and password entered
Signing in at www.sitefotos.com.

2. Find Your Company ID

Open Account Settings and look at the Profile tab. Two codes matter for the mobile app: the Company ID and the shorter Short ID. Field users sign in to the app with one of these codes plus their email address, so you will need one of them in step 8. Both have copy buttons, and both are case sensitive.

Account Settings showing the Company ID and Short ID with copy buttons
Company ID and Short ID both live under Account Settings > Profile.

3. Add Your Sites

Open Sites and click New Site. Start typing the address into the search box and pick the suggested match: the address fields and the map fill in automatically.

The new site screen with an address typed into the search box and a suggested match below it
Pick the suggested address and the rest fills itself in.

Sitefotos draws a geofence around the property. Drag its corner handles to match the actual boundary, give the site a name, and click Save. The geofence is what later tells the app how far a user is from each site.

A new site with its geofence drawn over aerial imagery and a tooltip that reads Drag the corners of the shape to adjust geofence
Drag the corners until the geofence hugs the property line.

Repeat for the rest of your properties. Ridge Works ends up with three sites, all active.

The Sites page listing three active sites
Three sites, all active.

4. Define Your Services

Open Services and click New Service. Pick the trade, give the service the name your team uses, and map it to one of the built-in internal services so reporting stays consistent. Ridge Works adds Snow Plowing (mapped to Push Lots) and Salting (mapped to Deice Lots).

The Add Service dialog with the trade, name, and internal service fields
A service is a trade, a name, and an internal mapping.

5. Add Materials

Open Materials. Depending on your trade, the account may already include a starter list; you can add your own with New Material. A material is just a name plus the unit you count it in, for example Bagged Rock Salt counted in Bags.

The New Material dialog with a material name and unit entered
A material is just a name and a unit.

6. Add Your People

Under CRM, add the people who will use Sitefotos. Employees are your own team; contractors are outside companies that work for you. The two are created in almost the same way, but they behave differently in the app later.

For an employee, CRM > Employees > New Employee. First name, last name, and email address are all a field user needs to sign in to the app. The same screen also holds per-person mobile app settings and website login permissions.

The employee screen with profile fields, mobile app settings, and website login permissions
One screen creates the person, their app access, and their website login.

For a contractor, CRM > Contractors > New Contractor. Fill in the person, their company, and their email address. Then use Assign Sites on the contractor record to choose which sites they should see. Ridge Works assigns Riley two of the three sites and deliberately leaves the third off.

The Site Assignment picker with two of three sites checked
Two of three sites assigned - the third is deliberately left off.

The contractor record now lists exactly the sites they are allowed to work. Site assignment is the single most common reason a contractor cannot see a site in the app, so it is worth getting right on day one.

A contractor record whose Sites panel lists the two sites assigned to them
The contractor's Sites panel is their entire world in the app.

7. Build the Form

Open Form Builder and create a new form. Drag fields from the palette on the left into the phone preview: the preview is exactly what field users will see. The Ridge Works form uses two Service fields (one wired to Snow Plowing, one to Salting), an Add Materials field, a paragraph for site notes, and a Site Info block.

  • Service fields are what turn a submission into service history: each checked service becomes a service record.

  • The Add Materials field lets the crew log which materials they used and how much.

  • Under Permissions, choose who can use the form and which sites it applies to. Everyone and All Sites is the simplest starting point.

Name the form and click Save.

Form Builder with the field palette, a phone preview of the form, and sharing options
The phone preview is exactly what the crew will see.

8. Sign In on the Mobile App

Now switch to the phone. Your field user installs the Sitefotos app, then signs in with their email address (the one on their contact record) and the Company ID from step 2. There is no app password: the email plus the code is the whole login.

The mobile app sign-in screen with an email address and Company ID entered
Email plus Company ID - that is the whole login.

After sign-in, the app shows the sites the user can see, sorted by distance. An employee sees the account's sites; a contractor sees only their assigned sites.

The mobile app Sites list showing all three sites with distances
All three sites, sorted by distance.

9. Complete a Site Visit

Tapping a site checks the user in and opens the form assigned to it. This is the form built in step 7, exactly as the preview showed it.

The form open on a site with two service checkboxes, an Add Materials row, and a notes box
The form from step 7, live on a real site visit.

The crew checks off the services performed, and taps the plus on Add Materials to log what was used. The material list comes straight from step 5.

The Select Material sheet listing the account's materials
The material list comes straight from the Materials page.

With services checked, materials counted, and a note in the box, the visit is ready to submit.

The form with both services checked, twelve bags of rock salt added, and a note typed
Services checked, twelve bags logged, note written.

Tap Submit. The app confirms and returns to the site list.

The Sites list with a toast reading Form submitted successfully
Submitted and back to the site list.

10. Watch the Work Arrive

Back in the backoffice, open Service History. The submission from the app has already created one service record per checked service: Snow Plowing and Salting, both in Logged status, with Mobile as the source. From here an administrator reviews and approves them, and they flow on into reporting and invoicing.

The Service History page with Snow Plowing and Salting rows in Logged status from the mobile source
Two Logged service records, source Mobile - the loop is closed.

Was this helpful?

Your feedback helps us make every guide clearer.